Project Name:
The Neosa Salvation Army Camp

Location:
Carrollton, OH USA

Type of Plant:
Package Plant - Nitrification

Technology Used:
Biowater CMFF®

Biomedia Used:
Biowater BWT-X®

Operational Since:
June 2013

Campneosa

The Challenge

Tie into the existing effluent outfall structure to replace the existing WWTP service at Camp Neosa that is impacted by seasonal flooding of Leesville Lake. Provide nitrification with a low maintenance (operational) system.

 

The Design

The wastewater treatment process used is our Complete Mixed Fixed Film (CMFF®), aka moving bed biofilm reactor (MBBR). The package treatment plant and the CMFF® process is a standalone biological treatment system, with no need for sludge recycle. Solids separation is required and is achieved by conventional means of gravity settling.  Solids are directly wasted without return sludge to the biological process.

The Neosa Salvation Army Camp Process is a two stage aerobic process followed by gravity clarification as shown.

 

Cmff Campneosa

 

 

Achievements

Neosa Sc1

Biowaters CMFF® prosess (Complete Mix Fixed Film) er en bioreaktor der biolegemer med en aktiv bakteriefilm på overflaten sirkulerer omkring, og hvor bakteriene fjerner organiske og uorganiske stoffer fra vannet.

Les mer...

Biowaters unike biolegemer er utviklet for maksimal biologisk rensing av avløpsvann. Biolegemenes overflate huser mikroorganismer som konsumerer forurensning som næring til egen vekst.

Les mer...